Sites Planning and Procurement Management, LTRNS20B (5 cr)
Code: LTP7080-3001
General information
- Enrollment
- 01.04.2022 - 30.04.2022
- Registration for the implementation has ended.
- Timing
- 05.09.2022 - 16.12.2022
- Implementation has ended.
- Number of ECTS credits allocated
- 5 cr
- Local portion
- 5 cr
- Mode of delivery
- Contact learning
- Unit
- Insinöörikoulutus / Rakennustekniikka (IR)
- Campus
- Wärtsilä Campus Karjalankatu 3
- Teaching languages
- Finnish
- English
- Seats
- 20 - 45
- Degree programmes
- Degree Programme in Construction Engineering
- Teachers
- Janne Väätäinen
- Annikki Tanskanen
- Teacher in charge
- Annikki Tanskanen
- Groups
-
LTRNS20Engineering, Civil Engineering, Construction
- Course
- LTP7080
Evaluation scale
H-5
Objective
The student
- knows the duties and responsibilities of site manager
- knows how to acquire the required permits for construction, how to do the necessary notices and agree on inspections during construction
- knows how to draw up action area plan and site layout plan
- knows how to make quality, equipment, procurement etc. plans for sites
- knows how to control humidity during construction
- understands the significance of procurement and knows the procedures of procurement on construction site
- knows the basics of site logistics
- knows the meeting procedures on site and the principles of site documentation
- knows how to plan the procedures at the handover stage
Content
- the main duties and responsibilities of site managerpermits, notices and inspections
- action area plan and site layout plan
- humidity control plan
- planning the handover stage
- quality planequipment plan
- significance of procurement
- procurement plan
- meeting procedures on site
- basics of site logistics
- planning the handover stage and documentation on the building
Teaching methods
Opintojakso toteutetaan kahdessa osassa: Työmaasuunnittelu 3 op ja Hankintatoimi 2 op.
Student workload
Luennot ja harjoitustehtävät 50 h, Harjoitustyö 33 h, Itsenäinen työskentely 50 h